1. Future lake site.              2. Future dam site.                    3. Clearing water line.
Pictures 4 -6 Clearing continues.
Pictures 7 -9 Stripping topsoil from inside lake.
10. Borrow area to be cleared.  11. Borrow area cleared.      12. Stripping topsoil from
                                                                                           borrow area.
13.Excavation of keyway.   14. Adding water for compaction. 15. Dam and liner rise
                                                                                            together.
Pictures 16 -18 Shows the dam and liner continuing to rise.
Pictures 19 - 21 Shows the dam and liner as they reach desired elevation.
22. Spillway excavation     23. Felt placed in bottom of           24. Rock for spillway.
                          spillway, to help prevent erosion.
25. Placing rock.                 26. Rocks have been placed.   27. Setting box culverts
                                                                                         for driveway.
28. Box culverts set.           29. Dirt placed over culverts.  30. Time to reclaim the
                                                                                       borrow area.
31. - 33. Shows the borrow area being graded back.
34. - 35. Borrow area nears completion.                           36. Borrow area restored.
37. Back side of dam finished.  38. - 39. The lake full with fountain.